Have to remove the paint from the block so they can repaint it which seems to come off rather easy with just the wand, have not tried the turbo yet. Have to clean all of the prestressed around the windows.
The building is about 150x130 and 30' high on the high side.
I am figuring around 70 hrs due to the cutins around the windows and after doing a test section.
Any insight would be appriciated, don't think I will loose my tail, but I may be low or high in my estimated time.
Have to remove the paint from the block so they can repaint it which seems to come off rather easy with just the wand, have not tried the turbo yet. Have to clean all of the prestressed around the windows.
The building is about 150x130 and 30' high on the high side.
I am figuring around 70 hrs due to the cutins around the windows and after doing a test section.
Any insight would be appriciated, don't think I will loose my tail, but I may be low or high in my estimated time.
http://frontiernet.net/~hostileone/pw/commcntr/
Share this post
Link to post
Share on other sites