Did my first “paying” job this past weekend. Cleaned about 600sq ft of a concrete slab that has never been cleaned for the past 30 years. Then I did about the same footage on concrete block with heavy heavy mold. It took me about two hours with beer breaks… when the job was finished I told the homeowner I would take $150.00 for the work. The homeowner said she would give me a steak dinner with all the fixings in trade… gee moms are great!!!!
But on a serious note… I did the work in about two hours with breaks, moving stuff around, and clean up. The concrete slab never looked that good before the entire time when i lived at home. Wow it’s amazing how things can turn out when you do your homework and read the proper ways of doing things.
Did my first “paying” job this past weekend. Cleaned about 600sq ft of a concrete slab that has never been cleaned for the past 30 years. Then I did about the same footage on concrete block with heavy heavy mold. It took me about two hours with beer breaks… when the job was finished I told the homeowner I would take $150.00 for the work. The homeowner said she would give me a steak dinner with all the fixings in trade… gee moms are great!!!!
But on a serious note… I did the work in about two hours with breaks, moving stuff around, and clean up. The concrete slab never looked that good before the entire time when i lived at home. Wow it’s amazing how things can turn out when you do your homework and read the proper ways of doing things.
Thanks for all the info posted on this board.
Share this post
Link to post
Share on other sites