I have been use to xjetting and not put much thought into downstreaming but tommorrow i plan on trying it. My situation is a pre paint prep painted cmu block building. My equipment is (2) Hydrotek hot/cold pw @ 5.5 gpm 3000 psi. Im thinking 12% shc and TSP. What kind of ratios would you downstreamers suggest?
I have been use to xjetting and not put much thought into downstreaming but tommorrow i plan on trying it. My situation is a pre paint prep painted cmu block building. My equipment is (2) Hydrotek hot/cold pw @ 5.5 gpm 3000 psi. Im thinking 12% shc and TSP. What kind of ratios would you downstreamers suggest?
Share this post
Link to post
Share on other sites