I just started using my second rig last week, and I must say, it jams thru jobs having 2 rigs/ and 2 vehicles going at once, we average 2-3 decks a day easily, and I am talking about stripping/ washing, britening etc.. the whole ball of wax, and these arent small decks, average so far this year is approx. 1100 sq ft, and we are getting thru each in about 2-3 hours, I had no idea how fast a second rig makes jobs go, I cant wait until next year when I have 2 rigs on each vehicle and 2 vehicles hitting the monster decks, roof's fences, etc..
I plan on having 2-8 GPM machines in each Ext. Van, that will rip through the monsters...: ) so far, I havent had any trouble with the homes we are at pumping out 13 GPM to keep up with our 8 and 5 GPM rigs, so I am guessing a couple more gallons per minute shouldnt change things...
I just started using my second rig last week, and I must say, it jams thru jobs having 2 rigs/ and 2 vehicles going at once, we average 2-3 decks a day easily, and I am talking about stripping/ washing, britening etc.. the whole ball of wax, and these arent small decks, average so far this year is approx. 1100 sq ft, and we are getting thru each in about 2-3 hours, I had no idea how fast a second rig makes jobs go, I cant wait until next year when I have 2 rigs on each vehicle and 2 vehicles hitting the monster decks, roof's fences, etc..
I plan on having 2-8 GPM machines in each Ext. Van, that will rip through the monsters...: ) so far, I havent had any trouble with the homes we are at pumping out 13 GPM to keep up with our 8 and 5 GPM rigs, so I am guessing a couple more gallons per minute shouldnt change things...
Share this post
Link to post
Share on other sites