Chad A 14 Report post Posted June 11, 2012 Here is what I have and want to do. I have a down stream high draw 20% fixed rate chem injector. I have read about not place this in line with hoses or guns as it will damage them over time. I have a GP TS2021 running about 5.6 GPM My questions are: 1.How long of time? 2.What is yalls recommendations on setup 3. Can I use the second output on pump and run another unloader and hose setup just for applying chemical. 4. Or should I just carry around a bucket and place it at the end of my wand. Thanks for input Share this post Link to post Share on other sites
Timo 25 Report post Posted June 11, 2012 Here is what I have and want to do.I have a down stream high draw 20% fixed rate chem injector. I have read about not place this in line with hoses or guns as it will damage them over time. I have a GP TS2021 running about 5.6 GPM My questions are: 1.How long of time? 2.What is yalls recommendations on setup 3. Can I use the second output on pump and run another unloader and hose setup just for applying chemical. 4. Or should I just carry around a bucket and place it at the end of my wand. Thanks for input 1. Until it wears out, clogs, breaks a spring, or craps out otherwise. Always have a spare and don't worry about it. 2. My'alls recommendation is to put it after the pump, before the real, on the trailer. 3. No. Not now. Not ever. 4. No, see item 3 answer for further information. 5. Unsolicited advice. Draw some water through the injector at the end of the day if you like. You're welcome. Share this post Link to post Share on other sites
Chad A 14 Report post Posted June 11, 2012 Thank you Timo That is what I am gonna do then. Share this post Link to post Share on other sites