I have been re-evaluating my fee schedule and wanted it to reflect my actual/average production times and costs. I want my pricing to better reflect actual labor and be able to distinguish material costs and depreciation better. I don’t mind sharing my pricing or what this deck priced out at but I am more interested in comparing how my labor compares to others.
This deck is a very nondescript, very average deck with an unknown stain, unknown age, and unknown history. The house is 12 years old and I am not sure when the deck was added. I was there to do an interior painting estimate and gave them an estimate on exterior painting and deck restoration while there hoping for the upsell. Finished the interior and deck last week and have the exterior scheduled for October.
I used this deck as a sample because it would be a good sample to test my production times. If you want to play along could you give how many direct MH (excluding transportation) you would have in these areas:
I have been re-evaluating my fee schedule and wanted it to reflect my actual/average production times and costs. I want my pricing to better reflect actual labor and be able to distinguish material costs and depreciation better. I don’t mind sharing my pricing or what this deck priced out at but I am more interested in comparing how my labor compares to others.
This deck is a very nondescript, very average deck with an unknown stain, unknown age, and unknown history. The house is 12 years old and I am not sure when the deck was added. I was there to do an interior painting estimate and gave them an estimate on exterior painting and deck restoration while there hoping for the upsell. Finished the interior and deck last week and have the exterior scheduled for October.
I used this deck as a sample because it would be a good sample to test my production times. If you want to play along could you give how many direct MH (excluding transportation) you would have in these areas:
1 - Strip
2 – Prep
3 - Stain
Sample Deck
12x16 Pressure Treated Pine
Standard 4 steps 3’ wide
36’ Total Rails
Sample After.pdf
Sample After Prep.pdf
Sample Before.pdf
Sample before - After.pdf
Edited by TonygShare this post
Link to post
Share on other sites