How would you go about tackling this. It's a clean and recoat.
I did one last year that was similar but wasn't as high and didn't have the patio below, just rock. I used a ladder to climb over the rail so I would not have to go through the home and it was all very light carpet. I applied the stain by brush to help with drips and running. That one took about a total of 3 hours on site in 2 trips to clean and stain.
How much extra would you get for taping and plastic of all the lower area?
How would you go about tackling this. It's a clean and recoat.
I did one last year that was similar but wasn't as high and didn't have the patio below, just rock. I used a ladder to climb over the rail so I would not have to go through the home and it was all very light carpet. I applied the stain by brush to help with drips and running. That one took about a total of 3 hours on site in 2 trips to clean and stain.
How much extra would you get for taping and plastic of all the lower area?