I got a call today from a guy that had laid a stone walk right before a downpour,the area flooded and every stone became covered with mortar.It was dry and a half inch thick in some places.I offered to come back another day more prepared(tgs) for the job,but after a turbo nozzle test spot he was happy with the results.This was about 90%-95% effective.I was thinking a wire brush/chisel and muriatic for the stubborn spots but I could be wrong.What would you do?sorry no pics I have them on film and could post later.thanks
I got a call today from a guy that had laid a stone walk right before a downpour,the area flooded and every stone became covered with mortar.It was dry and a half inch thick in some places.I offered to come back another day more prepared(tgs) for the job,but after a turbo nozzle test spot he was happy with the results.This was about 90%-95% effective.I was thinking a wire brush/chisel and muriatic for the stubborn spots but I could be wrong.What would you do?sorry no pics I have them on film and could post later.thanks
Share this post
Link to post
Share on other sites