PressurePros 249 Report post Posted November 7, 2006 Working on a property flip and I am not equipped for roof cleaning (plus I hate it). Will include gutter cleanout so you gotta get up there. I'll pay you the minute you finish. Name your price. Someone that has the safety gear, pumps and chem tank can make over $100/hr. Approx 90 LF of second story gutter. Another 50 on the first floor. This picture is front. Identical on back. Plus is Sod is not going until next week so you don't have to worry about killing anything. Negative is. I need you here by Friday at the latest. Please call me ASAP 610-662-4036 Share this post Link to post Share on other sites
Celeste 341 Report post Posted November 7, 2006 Euwwwww! When's the last time that house saw soap? Celeste Share this post Link to post Share on other sites
Anthony G 14 Report post Posted November 7, 2006 I have to agree with Celeste.......that house needs a bath at the least. Should be good before and after photos. Share this post Link to post Share on other sites
PressurePros 249 Report post Posted November 7, 2006 You mean something like this? Share this post Link to post Share on other sites
PA Dutchman 14 Report post Posted November 7, 2006 GREAT LOOKING RESULTS!!! Can't wait to see how the roof turns out! Share this post Link to post Share on other sites
PressurePros 249 Report post Posted November 7, 2006 If all goes according to plan we'll have some roof pictures by Thursday afternoon. Share this post Link to post Share on other sites
A and J POWERWASHING 64 Report post Posted November 10, 2006 house looks good did you find someone to do the roof Share this post Link to post Share on other sites
PressurePros 249 Report post Posted November 10, 2006 yes, AJ thank you. Completed today Share this post Link to post Share on other sites
A and J POWERWASHING 64 Report post Posted November 11, 2006 Cool Post Some Roof Pics Share this post Link to post Share on other sites
PressurePros 249 Report post Posted November 11, 2006 I have to go back and get pics. They are are gonna be delayed as the scaffolding is still up and the (areas of) the support ledges are gonna need to be touched up. Share this post Link to post Share on other sites