i'm new to downstreaming and I just wanted to see what you downstreamers would do. Would you put the injector at A or B? Also, I will be primarily a one-man show at 8gpm. The shutoff valves and tee are for those times when i bring a helper and we can shift to 2 guns at 4gpm. Would you use 1/2" jumper hose from the PW to the tee? Or is that not necessary? Also, i'm assuming that it would be impossible(with this setup) to downstream with one gun and rinse with the other, but please correct me if I am wrong. I ordered a General Hi-Draw injector from Bob at pressuretek in case that info helps.
i'm new to downstreaming and I just wanted to see what you downstreamers would do. Would you put the injector at A or B? Also, I will be primarily a one-man show at 8gpm. The shutoff valves and tee are for those times when i bring a helper and we can shift to 2 guns at 4gpm. Would you use 1/2" jumper hose from the PW to the tee? Or is that not necessary? Also, i'm assuming that it would be impossible(with this setup) to downstream with one gun and rinse with the other, but please correct me if I am wrong. I ordered a General Hi-Draw injector from Bob at pressuretek in case that info helps.
Share this post
Link to post
Share on other sites