Sarika 14 Report post Posted December 3, 2007 Contracts for steel and cladding works are often awarded to companies that subcontract the work out to the lowest bidder with the work often being subcontracted to yet another level below. Multi-tiered subcontracting arrangements can easily end up full of design and coordination problems, often resulting in inefficiency, delays and ultimately higher costs to you, the client. Craft Projects International (CPI) addresses this problem by keeping all of our project activities in-house. We offer you an end-to-end solution, right from the design stage all the way through to completion of works. Share this post Link to post Share on other sites
Adrian 155 Report post Posted December 3, 2007 Huh!!! Share this post Link to post Share on other sites
Doug T 19 Report post Posted December 3, 2007 Something was lost in the translation Share this post Link to post Share on other sites
Beth n Rod 1,279 Report post Posted December 3, 2007 I think...he's looking for subs? Overseas? Not 100% sure... Beth Share this post Link to post Share on other sites