Jump to content
Sign in to follow this  
diljala

Recoating ReadySeal 'Wet on dry', 'Wet on Wet' or 'one heavy coat'

Recommended Posts

I stripped my 350 sq ft pretty old deck off Behr and some other stain under it, using light Naoh solution and powerwashing. Then I neutralized with oxalic and did some light sanding. I got rid of 97% of stain. 3% is mostly on verticals/ railings. I plan to apply two coats of ReadySeal medium red stain (ordered 5 gallon) using roller and brush one of these days when temp is around 90-100. The instructions say "Apply two light coats with 45 minutes or more between coats". So can I walk over the stain after 45 minutes to apply stain on horizontals? Or is the preferred method instead of that is 'wet on wet' or 'one heavy coat'. How much is the interval for wet on wet: a minute or so?

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now

Sign in to follow this  

×