Its been really hot and dry here and was wondering how everyone decides if a surface is too hot to seal/stain.
I was going to use ATO on a small walkway and when I took a surface temp reading it was 129 degrees, and decided against doing it. Luckily its just down the road a bit but still its a return trip and that cuts into the $$ made.
Does everyone just wing it and hope for the best? If so hows the failure rate?
I hate the thought of returning to a job another day that could have easily been done today. Should I leave my meter at home?
Its been really hot and dry here and was wondering how everyone decides if a surface is too hot to seal/stain.
I was going to use ATO on a small walkway and when I took a surface temp reading it was 129 degrees, and decided against doing it. Luckily its just down the road a bit but still its a return trip and that cuts into the $$ made.
Does everyone just wing it and hope for the best? If so hows the failure rate?
I hate the thought of returning to a job another day that could have easily been done today. Should I leave my meter at home?
Share this post
Link to post
Share on other sites