This deck scared off 4 previous contractors. It had a nasty finish on it that was very hard to remove. I used HD80 and let it dwell 30 min. and then washed it with my chem tip! I'm glad I took the job and hopefully, so is my customer. The deck is 535 sq. ft. and it took me about 2 hours. If it was an oil base, it would have taken me half the time. Patience is NOT one of my virtues, but these jobs are forcing me to acquire some.
This deck scared off 4 previous contractors. It had a nasty finish on it that was very hard to remove. I used HD80 and let it dwell 30 min. and then washed it with my chem tip! I'm glad I took the job and hopefully, so is my customer. The deck is 535 sq. ft. and it took me about 2 hours. If it was an oil base, it would have taken me half the time. Patience is NOT one of my virtues, but these jobs are forcing me to acquire some.