I'm thinking of switching to downstreaming from the M5. I have a 4GPM machine. Would a size #25 be better for me than a #40. I'm thinking of getting both a 25deg and 00deg sray pattern for the chem application. Also, I usually pull out 200' of HP hose. How long does it take to clear the line of chems when rinsing and about how much chem is wasted when I clear the line.
I'm thinking of switching to downstreaming from the M5. I have a 4GPM machine. Would a size #25 be better for me than a #40. I'm thinking of getting both a 25deg and 00deg sray pattern for the chem application. Also, I usually pull out 200' of HP hose. How long does it take to clear the line of chems when rinsing and about how much chem is wasted when I clear the line.
Thx,
Chris
Share this post
Link to post
Share on other sites