This is on a new construction home that sat for a few years. Guess they never finished this portion. We stained the deck and I said I would do something about this gap between the siding and floor.
I've done some decks where there is a 2x2 up against the house but even in those cases the siding usually still goes to the bottom.
The gap here varies from 2" to 2 3/8". I thought I could just run a 2x2 but obviously that won't work (only 1.5"). How should this normally be finished? I feel like every deck I've done the siding goes down to the joist so I've never seen this before. I could rip down a 1x4 but with the space not being even that still leaves a pretty large gap on either the top or bottom. Any suggestions?
This is on a new construction home that sat for a few years. Guess they never finished this portion. We stained the deck and I said I would do something about this gap between the siding and floor.
I've done some decks where there is a 2x2 up against the house but even in those cases the siding usually still goes to the bottom.
The gap here varies from 2" to 2 3/8". I thought I could just run a 2x2 but obviously that won't work (only 1.5"). How should this normally be finished? I feel like every deck I've done the siding goes down to the joist so I've never seen this before. I could rip down a 1x4 but with the space not being even that still leaves a pretty large gap on either the top or bottom. Any suggestions?