I'm sure all of you in the northeast are already 2-3 weeks behind this season compared to last year due to the weather. This is already causing a decent backup of jobs. We are anxious to start some of our decks next week, but the temps are supposed to be in the low 40's and then there is the moisture issue (which we use a moisture meter to check). I use AC most of the time, and it states to apply at 50+ degrees.
What is the lowest temperature you will start staining?
I'm sure all of you in the northeast are already 2-3 weeks behind this season compared to last year due to the weather. This is already causing a decent backup of jobs. We are anxious to start some of our decks next week, but the temps are supposed to be in the low 40's and then there is the moisture issue (which we use a moisture meter to check). I use AC most of the time, and it states to apply at 50+ degrees.
What is the lowest temperature you will start staining?
Share this post
Link to post
Share on other sites