I went today to bid a job. 500 sq ft deck with 91 ft of railing and 100 spindles. The deck is about 15 years old, and 10 feet off the ground. Needs stripped, cleaned and stained. I bid it at $1700. I give it to the lady and she almost loses it. She was under the impression I would just come in and spray over the old stuff, that is around 5 years old. She says she is getting ready to sell the house and just wants the deck "touched up". Yeah right. People are amazing. I told her about the old sealer interfering with the new sealer, but she didnt want to hear it. She said she was going to do it herself. I would love to see that deck when she gets done with it.
I went today to bid a job. 500 sq ft deck with 91 ft of railing and 100 spindles. The deck is about 15 years old, and 10 feet off the ground. Needs stripped, cleaned and stained. I bid it at $1700. I give it to the lady and she almost loses it. She was under the impression I would just come in and spray over the old stuff, that is around 5 years old. She says she is getting ready to sell the house and just wants the deck "touched up". Yeah right. People are amazing. I told her about the old sealer interfering with the new sealer, but she didnt want to hear it. She said she was going to do it herself. I would love to see that deck when she gets done with it.
Share this post
Link to post
Share on other sites