Today one of my guys said at the end of the day yesterday he sunk the lift in the grass a little. I told him no big deal we'll look at it. When we turned the corner there was water bubbling up from the ground. I said OH S--- I called the PM and told her. The sent irrigation guy , then fire sprinler guy, Well after about an hr and 7 or 8 more guys they finally got the water off. Im thinking they are going to try to lay this on me. My lift My problem> It was the main to building. Now they have to go in 26 units and turn of water heaters etc It a 4" main reduce to a 3" and it was ONLY 6" under ground and on top of that the fill that they used was crap there was a rock about a fot long and wide right on top of the pipe. Im talking with const. super and said your not trying to lay this on me. Plumbers show up and laughed how shallow it was. Long story short they fixed it put it lower and told me not my fault COOL
Now Monday we were finishing high rise we were on the bottom floor and fire alarms starts going off, GM calls and said it was because of US. I said maybe but we have everything covered with tape, nothing more we could of done. The 2 fire trucks come screaming in. Im like OH S---. Well I hear on maint. radio, That yes he(we) have everything covered. No problem not our fault!!
You know I hope nothing else happens this week, I cant handle something else thats not our fault
Other than that both jobs are going well , this big jobs going real well
Except for the 35MPH winds that blew mix all over the windows we already cleaned, Thats another story. we'll take care of that tomorrow
At least there good $$$ jobs, always something, just got to go with the flow
Life is Good but can be stressful also
Today one of my guys said at the end of the day yesterday he sunk the lift in the grass a little. I told him no big deal we'll look at it. When we turned the corner there was water bubbling up from the ground. I said OH S--- I called the PM and told her. The sent irrigation guy , then fire sprinler guy, Well after about an hr and 7 or 8 more guys they finally got the water off. Im thinking they are going to try to lay this on me. My lift My problem> It was the main to building. Now they have to go in 26 units and turn of water heaters etc It a 4" main reduce to a 3" and it was ONLY 6" under ground and on top of that the fill that they used was crap there was a rock about a fot long and wide right on top of the pipe. Im talking with const. super and said your not trying to lay this on me. Plumbers show up and laughed how shallow it was. Long story short they fixed it put it lower and told me not my fault COOL
Now Monday we were finishing high rise we were on the bottom floor and fire alarms starts going off, GM calls and said it was because of US. I said maybe but we have everything covered with tape, nothing more we could of done. The 2 fire trucks come screaming in. Im like OH S---. Well I hear on maint. radio, That yes he(we) have everything covered. No problem not our fault!!
You know I hope nothing else happens this week, I cant handle something else thats not our fault
Other than that both jobs are going well , this big jobs going real well
Except for the 35MPH winds that blew mix all over the windows we already cleaned, Thats another story. we'll take care of that tomorrow
At least there good $$$ jobs, always something, just got to go with the flow
JL
Share this post
Link to post
Share on other sites