Started a 2400 sq. ft. ipe' job today. Hot as blazes, in the low 90's, with a lot of good old east coast humidity. New wood, percarb, oxalic, sand, and stain. Nice job.
What was better is there is an ipe' dock and ipe' trimmed out salt water pool. Dock done in the early AM when it was still somewhat cool, so used my DUI drysuit.
In the afternoon heat, got to wash the ipe' trim around the perimeter of the pool. No way my helper, Oscar, was going to beat me to this punch. Can't beat swimming, working, and getting paid for the pleasure!
Started a 2400 sq. ft. ipe' job today. Hot as blazes, in the low 90's, with a lot of good old east coast humidity. New wood, percarb, oxalic, sand, and stain. Nice job.
What was better is there is an ipe' dock and ipe' trimmed out salt water pool. Dock done in the early AM when it was still somewhat cool, so used my DUI drysuit.
In the afternoon heat, got to wash the ipe' trim around the perimeter of the pool. No way my helper, Oscar, was going to beat me to this punch. Can't beat swimming, working, and getting paid for the pleasure!
Share this post
Link to post
Share on other sites