I was called to price out a job (pics attached) I gave the gentlemen the quote and I almost think he was shocked at the price. I am not asking how much anyone would charge for the job but how long it would take you with your set-up. And how long I should figure it would take me with a 4GPM 4000PSI cold water unit using an x-jet, one man on a gun and a helper for odds and ends. I have everything set up on a trailer with a buffer tank and the works. I figured it was going to take me 10 hours with my set-up.
The building has a foot print of 3840sqft, the front is 2.5 stories and the rear is 2.
Hello everyone,
I was called to price out a job (pics attached) I gave the gentlemen the quote and I almost think he was shocked at the price. I am not asking how much anyone would charge for the job but how long it would take you with your set-up. And how long I should figure it would take me with a 4GPM 4000PSI cold water unit using an x-jet, one man on a gun and a helper for odds and ends. I have everything set up on a trailer with a buffer tank and the works. I figured it was going to take me 10 hours with my set-up.
The building has a foot print of 3840sqft, the front is 2.5 stories and the rear is 2.
Share this post
Link to post
Share on other sites